Gardex was engaged by Capstone Construction to deliver perimeter security fencing and automated access solutions for the new Lindsay
Transport logistics facility in High Wycombe. The project was designed to accommodate heavy vehicle, light vehicle and pedestrian movements while
maintaining high levels of site security and compliance.
Supply & install:
- 300lm of 2100mm-high black powder-coated garrison fencing.
- Three automated black powder-coated garrison sliding gates for truck and vehicle access.
- Three black powder-coated garrison pedestrian swing gates.
- 60lm of 3m-high Colorbond fencing with internal CFC lining for acoustic screening along the residential interface.
- Two aluminium slat compounds with associated swing gates.
- Non-conductive FRP isolation posts with earth tabs to separate fence runs beneath overhead powerlines.
- Automated access systems, testing and commissioning.