Gardex was engaged to upgrade and secure the perimeter of the Bridgetown Depot through the removal of existing fencing and installation of new high-security garrison fencing and gates. The project included fence replacement, gate relocation works, and associated civil works to improve site access and security.
Supply & install:
- Mobilisation and site establishment, including freight, accommodation and workforce logistics.
- Removal and disposal of approximately 517 metres of existing chainwire fencing and associated footings.
- Supply and installation of 517 metres of 2100mm-high black powder-coated garrison fencing.m
- Supply and installation of two 6.0m-wide manual double swing garrison gates.
- Supply and installation of one 1.0m-wide pedestrian swing gate.
- Removal and relocation of an existing automated double garrison gate, including gate posts and motor infrastructure.
- Excavation and installation of 30 metres of underground electrical conduit to the new gate motor location.