Gardex was engaged by MPC Kinetic to provide and install perimeter security fencing and access gates for the new Iron Bridge Raw Water Pipeline facility. the works delivered a secure enclosure around critical infrastructure, ensuring controlled site access and enhanced asset protection.
Supply & install:
- Mobilisation and demobilisation of personnel, equipment, and materials to site.
- Supply and installation of 34 metres of 1800mm-high chainwire security fencing.
- Installation of three rows of barbed wire on cranked extensions for increased site security.
- Supply and installation of a 6.0m-wide double chainwire access gate.