Gardex was engaged by Westforce Construction to deliver perimeter security fencing and automated access control infrastructure for the Pilgangoora Mid Stream Project. The scope included the installation of high-security chainmesh fencing and custom fabricated access gates designed to provide secure and reliable entry to critical project infrastructure.
Supply & install:
- 171 linear metres of 1800mm-high galvanised chainmesh security fencing.
- Installation of three rows of galvanised barbed wire on cranked fence extensions to enhance site security.
- Two galvanised single swing access gates with weldmesh infill panels.
- Two custom fabricated 7.0m-wide automated cantilever sliding gates.